2 / FIRST INSTALLATION
When installing the GREEN SPEED CONTROL for the first time, proceed as follows:
The tip of the putter grip should be drilled with the supplied drill bit (diameter 10 mm), very easy maximum time to do one minute.
Another possibility is to have your golf pro-shop install a grip with a removable tip, for example: SUPERSTROKE + SERIES countercore.
3 / FIXING THE WEIGHT IN THE SHAFT OF THE PUTTER
We introduce the chosen ballast into the shaft of the putter, then lock it by screwing it in with the rod on the alen key side.
To remove it, once the ballast has been loosened, the rod on the thread side is screwed into the ballast and everything is removed.